posted in:

YIN - Northrop Grumman

US$596 million CVN 78 award for Northrop Grumman Newport News for CVN 78

Monday, Jan 14, 2008

Northrop Grumman Newport News, Newport News, Va., is being awarded a $595,944,566 modification to previously awarded contract (N00024-04-C-2118) for the continuation of CVN 78 class design effort; long lead time material procurement; and non-nuclear advance construction for the lead ship of the class, Gerald R. Ford (CVN 78), including system development, engineering services, and feasibility studies for the Future Aircraft Carrier Program.

Northrop Grumman Newport News will provide all services and material in preparation for construction of CVN 78 including necessary research studies; engineering; design; related development efforts, including required engineering development models and prototypes for engineered components; advanced planning; advanced procurement for detailed design and procurement/fabrication of long lead material; advanced construction; system specifications; design weight estimate; logistics data; lists of government-furnished equipment; production planning; further definition of initiatives to reduce CVN 78 class total ownership costs; and other data to support an integrated product data environment for the CVN 21 program.

Work will be performed in Newport News, Va. (92 percent) and Groton, Conn. (8 percent), and is expected to be completed by July 2008. Contract funds will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington Navy Yard, D.C. is the contracting activity.

 

Source: Marine Log

posted in:

Other Ship Building News

Todd Shipyards Corporation Announces Quarterly Financial Results For December 27, 2009 09-02-2010
Illustrious arrives at Rosyth 09-02-2010
Costa Deliziosa, the new jewel of the Costa Cruises fleet, is delivered in Venice 08-02-2010
BAE Systems Signs Partnership with Oman Sail 05-02-2010
Northrop Grumman Reports Fourth Quarter and 2009 Financial Results 05-02-2010
Jurong Shipyard to build a new shipyard in Brazil 04-02-2010
Saigon Terminal Officially Opened 04-02-2010
Keppel AmFELS delivers jackup Tuxpan to Perforadora Central on time 03-02-2010
Aegean Marine Petroleum Network Inc. Takes Delivery of Bunkering Tanker Newbuilding 03-02-2010
SHI To Make Only Eco-Friendly Ships 30% Reduction in Greenhouse Gas Emissions Planned 02-02-2010

Advertisers