posted in:

QUEEN MARY 2 docking at Blohm + Voss Repair

Thursday, Oct 23, 2008

For the fourth time at Blohm + Voss Repair after November 2005, May and November 2006.

During the night of October 23 to 24, 2008, the longest ocean liner worldwide, the QUEEN MARY 2, will be docked at dry dock ELBE 17 of Blohm + Voss Repair, a company of ThyssenKrupp Marine Systems. At about 23:50 h on October 23, the QUEEN MARY 2 will be at the entrance of dry dock ELBE 17 ready to be manoeuvred into the dock. At about 0:50 h, October 24, when the tide has reached its highest level, the ocean liner will be floated into the dock.

The ocean liner will stay in the dock until November 13, 2008 for the "Refit 2008". Among others, the four Mermaid propulsion pods - two of them fixed and the other two azimuthing - will be partly disassembled and subjected to a general overhaul. In addition, the four stabilizer units and three bow thrusters will be maintained. Various other works as required by the classification society as well as a comprehensive preservation program will be completed as well. Upon completion, the QUEEN MARY 2 will be fit for service once again for another five years.

On November 13, 2008, at about 16:00 h, the QUEEN MARY 2 will leave the dock for Southampton to start the next transatlantic passage to New York on November 15, 2008, at 17:00 h.

ThyssenKrupp Marine Systems
ThyssenKrupp Marine Systems AG, with its head office in Hamburg, Germany, is part of ThyssenKrupp Technologies AG within the ThyssenKrupp Group. With its technological competence, extensive portfolio and continuous innovations the corporate group, being the umbrella organisation for shipyards in Germany, Sweden and Greece and various marine engineering companies, represents one of the leading systems houses in European shipbuilding.

 

Source: ThyssenKrupp

posted in:

Other Ship Building News

MHI Announces Outline of FY2010 First 3 Month Financial Results Ended June 30, 2010 (Consolidated) 30-07-2010
PGS Provides Update on New Builds in Spain 30-07-2010
Odfjell SE - First Six Months Result 2010 28-07-2010
Genco Shipping & Trading Limited Takes Delivery of Handysize Newbuilding 27-07-2010
Diana Shipping Inc. Majority Owned Subsidiary Takes Delivery of the Two Previously Announced Containership Vessels 27-07-2010
Keppel delivers Seadrill’s 5th KFELS B CLASS jackup rig 26-07-2010
BISSO Marine Performs Heavy Lift Jobs 26-07-2010
Austal Hosts Keel Laying Ceremony For US Army’s “Spearhead” (JHSV 1) 23-07-2010
Montreal Port Authority (MPA) - Situation at the Port of Montreal, July 21, 10:00 am 22-07-2010
Dockwise Announces $ 45 Million in Heavy Marine Transport Awards 22-07-2010

Advertisers