posted in:

Austal - www.yourshipbuildingnews.com

US Navy Orders Material For Additional Austal JHSVs

Monday, Jun 22, 2009

The US Navy has exercised contract options funding Austal’s acquisition of long lead-time material associated with the construction of two additional 103-metre Joint High Speed Vessels (JHSV).

Austal was awarded the initial contract to design and build the first 103 metre JHSV in November 2008. The contract included options for nine additional vessels to be awarded between FY09 and FY13.

Each JHSV is valued at approximately AUD $225 million, with the potential 10-vessel program valued at approximately AUD $2.3 billion.

Austal USA President and COO, Joe Rella said, “Due to on-time performance and high quality results during our design reviews with the Navy, and the efficiency of our material procurement to date, we have earned the confidence of the Navy to make this award. This is a testament to the quality products of our Program, Design, Production Control and Procurement teams.”

Long lead-time material for the additional vessels will include diesel engines, water jets and reduction gears.

Similar to the Austal-built “WestPac Express” operated by the US Marines for the past seven years, the JHSV will be capable of transporting troops and their equipment, supporting humanitarian relief efforts, operating in shallow waters and reaching speeds in excess of 35 knots fully loaded. The vessels will be a joint-use platform operated by both the United States Army and Navy.

Construction of the first JHSV is scheduled to commence at Austal’s US shipyard in November.


For further information on this delivery click here.

To download high resolution images to accompany this release click here.

Source: Austal

posted in:

Other Ship Building News

MHI Announces Outline of FY2010 First 3 Month Financial Results Ended June 30, 2010 (Consolidated) 30-07-2010
PGS Provides Update on New Builds in Spain 30-07-2010
Odfjell SE - First Six Months Result 2010 28-07-2010
Genco Shipping & Trading Limited Takes Delivery of Handysize Newbuilding 27-07-2010
Diana Shipping Inc. Majority Owned Subsidiary Takes Delivery of the Two Previously Announced Containership Vessels 27-07-2010
Keppel delivers Seadrill’s 5th KFELS B CLASS jackup rig 26-07-2010
BISSO Marine Performs Heavy Lift Jobs 26-07-2010
Austal Hosts Keel Laying Ceremony For US Army’s “Spearhead” (JHSV 1) 23-07-2010
Montreal Port Authority (MPA) - Situation at the Port of Montreal, July 21, 10:00 am 22-07-2010
Dockwise Announces $ 45 Million in Heavy Marine Transport Awards 22-07-2010

Advertisers